Software Engineering II MCQs with Answers
Practice important Software Engineering II MCQs with answers and explanations.
Chapter: 45
Q1341:
Process performance at Level 3 is ________ across the organization.
A. Variable
B. Consistent
C. Unpredictable
D. Unstructured
Correct Answer:
B
Chapter: 45
Q1342:
Level 4 emphasizes ________ control of processes.
A. Informal
B. Financial
C. Quantitative
D. Random
Correct Answer:
C
Chapter: 45
Q1343:
In Level 5, process improvements address ________ causes of variation.
A. Special
B. Random
C. Common
D. External
Correct Answer:
C
Chapter: 45
Q1344:
What does CMMI stand for?
A. Capability Maturity Model Integration
B. Certified Model Management Institute
C. Capability Managed Model Improvement
D. Control Maturity Model Interface
Correct Answer:
A
Chapter: 45
Q1345:
The continuous representation grants freedom to select ________.
A. Process Duration
B. Process Improvement Order
C. Management Hierarchy
D. Project Size
Correct Answer:
B
Chapter: 45
Q1346:
The staged representation provides a ________ path for improvement.
A. Random
B. Predetermined
C. Ad hoc
D. Selective
Correct Answer:
B
Chapter: 45
Q1347:
In project management, a project is a ________ endeavor.
A. Permanent
B. Finite
C. Continuous
D. Infinite
Correct Answer:
B
Chapter: 45
Q1348:
Project initiation is the ________ phase of a traditional project.
A. Middle
B. Final
C. First
D. Second
Correct Answer:
C
Chapter: 45
Q1349:
The project execution phase involves ________.
A. Planning
B. Designing
C. Production
D. Monitoring
Correct Answer:
C
Chapter: 45
Q1350:
Waterfall development follows a ________ sequence.
A. Parallel
B. Cyclic
C. Linear
D. Random
Correct Answer:
C
Chapter: 45
Q1351:
In software development, the Rational Unified Process (RUP) can adapt to the ________ methodology.
A. Agile
B. Spiral
C. Waterfall
D. V-Model
Correct Answer:
C
Chapter: 45
Q1352:
Cone of Uncertainty explains the uncertainty in the ________ phases of the project.
A. Planning
B. Monitoring
C. Completion
D. Execution
Correct Answer:
A
Chapter: 45
Q1353:
Projects can be terminated before reaching ________.
A. Execution
B. Planning
C. Completion
D. Monitoring
Correct Answer:
C
Chapter: 45
Q1354:
Level 5 processes use ________ and innovative improvements.
A. Regular
B. Random
C. Incremental
D. Non-systematic
Correct Answer:
C
Chapter: 45
Q1355:
________ goals are set for process output at Level 4.
A. Informal
B. Quantitative
C. Random
D. Undefined
Correct Answer:
B
Chapter: 45
Q1356:
A project differs from a process because it is ________.
A. Continuous
B. Finite
C. Unstructured
D. Infinite
Correct Answer:
B
Chapter: 45
Q1357:
A chaotic environment in processes indicates which CMM level?
A. Level 2
B. Level 1
C. Level 3
D. Level 5
Correct Answer:
B
Chapter: 45
Q1358:
What is the focus at CMM Level 5?
A. Documenting processes
B. Repeating processes
C. Continuous process improvement
D. Ad hoc production
Correct Answer:
C
Chapter: 45
Q1359:
Project monitoring and controlling are part of which phase?
A. Initiation
B. Completion
C. Planning
D. Control
Correct Answer:
D
Chapter: 45
Q1360:
Pre-Planning, Conceptual Design, and Schematic Design are phases in ________ industry.
A. Software
B. Bricks and Mortar Architecture
C. Agriculture
D. Aerospace
Correct Answer:
B