Skip to main content

Software Engineering II MCQs with Answers

Practice important Software Engineering II MCQs with answers and explanations.

Chapter: 2
Q61:
Peer reviews are used to __________ software defects early in development.
A. Promote
B. Introduce
C. Detect
D. Ignore
Correct Answer: C
Chapter: 2
Q62:
Integrated Software Management belongs to __________ level of CMM.
A. Level 2
B. Level 3
C. Level 4
D. Level 5
Correct Answer: B
Chapter: 2
Q63:
__________ focuses on coordinating different groups within a project.
A. Software configuration management
B. Inter-group coordination
C. Process change management
D. Defect prevention
Correct Answer: B
Chapter: 2
Q64:
__________ management ensures subcontracted software components meet standards.
A. Requirement
B. Software subcontract
C. Peer review
D. Quantitative process
Correct Answer: B
Chapter: 2
Q65:
__________ monitors the progress and quality of the software project activities.
A. Software project tracking and oversight
B. Software quality assurance
C. Process change management
D. Integrated software management
Correct Answer: A
Chapter: 3
Q66:
Which phase in a software lifecycle focuses on "why"?
A. Vision
B. Definition
C. Development
D. Maintenance
Correct Answer: A
Chapter: 3
Q67:
The maintenance phase focuses mainly on ________.
A. creation
B. requirements
C. change
D. design
Correct Answer: C
Chapter: 3
Q68:
A software lifecycle model depicts the _______ of a software product.
A. Cost
B. Steps
C. Errors
D. Sales
Correct Answer: B
Chapter: 3
Q69:
Which of the following is a software development lifecycle model?
A. Prototype-and-test
B. Build-and-fix
C. Model-view-controller
D. Top-down design
Correct Answer: B
Chapter: 3
Q70:
Which lifecycle model is best suited for small projects without formal design?
A. Spiral model
B. Build-and-fix model
C. Waterfall model
D. Incremental model
Correct Answer: B
Chapter: 3
Q71:
The cost of using build-and-fix model for large software projects is ________ than properly specified ones.
A. Lower
B. Same
C. Greater
D. Unaffected
Correct Answer: C
Chapter: 3
Q72:
The absence of _________ makes maintenance extremely difficult in the build-and-fix model.
A. Code comments
B. Documentation
C. Deadlines
D. Testing
Correct Answer: B
Chapter: 3
Q73:
The Waterfall model is also called the _______ model.
A. Incremental
B. Agile
C. Linear Sequential
D. Spiral
Correct Answer: C
Chapter: 3
Q74:
In Waterfall model, which activity comes first?
A. Coding
B. Design
C. Requirement analysis
D. Testing
Correct Answer: C
Chapter: 3
Q75:
Which model suggests a systematic, sequential approach to software development?
A. Agile
B. Waterfall
C. Spiral
D. Prototype
Correct Answer: B
Chapter: 3
Q76:
In the Waterfall model, what is the longest phase of the lifecycle?
A. Requirement Analysis
B. Testing
C. Maintenance
D. Design
Correct Answer: C
Chapter: 3
Q77:
In Waterfall model, a mistake discovered during testing should be ________.
A. Ignored
B. Fixed without documentation
C. Referred back and corrected
D. Skipped
Correct Answer: C
Chapter: 3
Q78:
One major drawback of the Waterfall model is ________.
A. Too much coding
B. Late client feedback
C. Immediate delivery
D. Less documentation
Correct Answer: B
Chapter: 3
Q79:
Which of the following is a documentation-driven model?
A. Build-and-fix
B. Waterfall
C. Spiral
D. Agile
Correct Answer: B
Chapter: 3
Q80:
The Rapid Prototyping model focuses on capturing ________.
A. System design
B. User requirements
C. Coding errors
D. Testing failures
Correct Answer: B

Test Your Knowledge

Take a timed quiz on Software Engineering II

🚀 Start Quiz Now