Q351: What is a characteristic of the waterfall model?
- A: Non-linear approach to development
- B: Multiple iterations per phase
- C: Linear progression through phases
- D: Complex interaction with users
View Answer
C
Q352: What should be prioritized in designing a database?
- A: User interface
- B: Scope and structure of the database
- C: Documentation requirements
- D: Availability of resources
View Answer
B
Q353: What does a logical design phase involve?
- A: Finalizing user manuals
- B: Converting design specifications into executable programs
- C: Breaking down the logical design into units
- D: Testing user interfaces
View Answer
C
Q354: What is the main focus of the incremental model in software development?
- A: Iteration of the product
- B: Development and maintenance
- C: Redesign of the product
- D: Cost reduction
View Answer
B
Q355: In the incremental model, what is the purpose of the first increment?
- A: To provide advanced functions
- B: To address basic requirements
- C: To finalize the product
- D: To gather user feedback
View Answer
B
Q356: Which of the following is NOT a characteristic of the incremental model?
- A: Partial systems built successively
- B: Highest priority requirements tackled early on
- C: All requirements are flexible
- D: Requirements for an increment are frozen
View Answer
C
Q357: The incremental model combines elements of which two models?
- A: Agile and Waterfall
- B: Waterfall and Prototyping
- C: Prototyping and Iterative
- D: Agile and Iterative
View Answer
B
Q358: What is one of the benefits of using the incremental model?
- A: Higher costs for clients
- B: Immediate feedback from the client
- C: Difficult to manage requirements
- D: Larger system perspective unavailable
View Answer
B
Q359: Fill in the blank: In the iterative model, the ________ step creates a base version of the system.
- A: Implementation
- B: Initialization
- C: Analysis
- D: Design
View Answer
B
Q360: What is the primary risk associated with iterative models?
- A: Overestimating costs
- B: Scope creep
- C: Delays in implementation
- D: Poor user feedback
View Answer
B