Q321: The feasibility study includes all the following areas EXCEPT:
- A: Technical Feasibility
- B: Economic Feasibility
- C: Social Feasibility
- D: Behavioral Feasibility
View Answer
C
Q322: The SDLC model used when feedback and prototype testing are essential at each phase is the ______.
- A: Spiral Model
- B: Iterative Model
- C: Waterfall Model
- D: V-Model
View Answer
B
Q323: In system design, a detailed ______ layout is required to meet the functional requirements.
- A: Organizational chart
- B: Screen
- C: Hardware
- D: System architecture
View Answer
B
Q324: Fill in the blank: The primary goal of ______ in SDLC is to ensure the system meets user needs and business goals.
- A: analysis
- B: programming
- C: testing
- D: design
View Answer
A
Q325: During the ‘Need Assessment’ phase, what is essential to define for addressing system problems?
- A: Software algorithms
- B: System requirements
- C: User feedback
- D: Data storage
View Answer
B
Q326: What is a key component of SDLC that ensures phase completion before moving to the next?
- A: Linear steps
- B: Code review
- C: Management oversight
- D: Project timeline
View Answer
A
Q327: What phase involves studying the existing system to understand task and social systems?
- A: Feasibility study
- B: System design
- C: System analysis
- D: Need assessment
View Answer
C
Q328: In system design, organizational ________ might need to change for system success.
- A: goals
- B: rules
- C: hierarchy
- D: structure
View Answer
D
Q329: ______ feasibility in SDLC determines if the system's benefits outweigh the costs.
- A: Technical
- B: Behavioral
- C: Economic
- D: Operational
View Answer
C
Q330: Which model emphasizes building software in incremental builds with each build tested as a whole?
- A: Iterative Model
- B: Waterfall Model
- C: Incremental Model
- D: Prototype Model
View Answer
C