Q321: The feasibility study includes all the following areas EXCEPT:
  • A: Technical Feasibility
  • B: Economic Feasibility
  • C: Social Feasibility
  • D: Behavioral Feasibility
View Answer
C

Q322: The SDLC model used when feedback and prototype testing are essential at each phase is the ______.
  • A: Spiral Model
  • B: Iterative Model
  • C: Waterfall Model
  • D: V-Model
View Answer
B

Q323: In system design, a detailed ______ layout is required to meet the functional requirements.
  • A: Organizational chart
  • B: Screen
  • C: Hardware
  • D: System architecture
View Answer
B

Q324: Fill in the blank: The primary goal of ______ in SDLC is to ensure the system meets user needs and business goals.
  • A: analysis
  • B: programming
  • C: testing
  • D: design
View Answer
A

Q325: During the ‘Need Assessment’ phase, what is essential to define for addressing system problems?
  • A: Software algorithms
  • B: System requirements
  • C: User feedback
  • D: Data storage
View Answer
B

Q326: What is a key component of SDLC that ensures phase completion before moving to the next?
  • A: Linear steps
  • B: Code review
  • C: Management oversight
  • D: Project timeline
View Answer
A

Q327: What phase involves studying the existing system to understand task and social systems?
  • A: Feasibility study
  • B: System design
  • C: System analysis
  • D: Need assessment
View Answer
C

Q328: In system design, organizational ________ might need to change for system success.
  • A: goals
  • B: rules
  • C: hierarchy
  • D: structure
View Answer
D

Q329: ______ feasibility in SDLC determines if the system's benefits outweigh the costs.
  • A: Technical
  • B: Behavioral
  • C: Economic
  • D: Operational
View Answer
C

Q330: Which model emphasizes building software in incremental builds with each build tested as a whole?
  • A: Iterative Model
  • B: Waterfall Model
  • C: Incremental Model
  • D: Prototype Model
View Answer
C