Q141: Which SDLC phase involves creating a blueprint for the desired solution without referencing specific technologies?
  • A: Physical Design
  • B: Logical Design
  • C: Implementation
  • D: Maintenance and Change
View Answer
B

Q142: What is the key difference between logical design and physical design phases in SDLC?
  • A: Logical design is technology-specific; physical design is not
  • B: Physical design focuses on business needs; logical design does not
  • C: Logical design is implementation-independent; physical design selects specific technologies
  • D: They are essentially the same
View Answer
C

Q143: During which SDLC phase are make-or-buy decisions made regarding system components?
  • A: Investigation
  • B: Analysis
  • C: Physical Design
  • D: Maintenance and Change
View Answer
C

Q144: What is typically created during the implementation phase of SDLC?
  • A: Project objectives
  • B: Preliminary cost-benefit analysis
  • C: Software, documentation, and user training
  • D: Feasibility study
View Answer
C

Q145: Which SDLC phase is generally the longest and most expensive?
  • A: Investigation
  • B: Implementation
  • C: Maintenance and Change
  • D: Analysis
View Answer
C

Q146: What is the main activity during the Maintenance and Change phase of SDLC?
  • A: Developing initial project scope
  • B: Testing individual components
  • C: Supporting and modifying the system over its operational life
  • D: Conducting feasibility studies
View Answer
C

Q147: At what point might a system development project be terminated according to the SDLC model?
  • A: Only after full implementation
  • B: During any phase after structured review
  • C: Never, once initiated it must be completed
  • D: Only during the investigation phase
View Answer
B

Q148: Why is constant examination and renewal important in information security programs?
  • A: To reduce development costs
  • B: To adapt to the constantly changing environment
  • C: To eliminate the need for maintenance
  • D: To avoid user training
View Answer
B

Q149: Which SDLC phase uses information from the investigation phase to determine what the new system is expected to do?
  • A: Analysis
  • B: Logical Design
  • C: Implementation
  • D: Physical Design
View Answer
A

Q150: What is evaluated during the preliminary cost-benefit analysis in the investigation phase?
  • A: Technical specifications
  • B: Perceived benefits and appropriate cost levels
  • C: User interface design
  • D: Software coding requirements
View Answer
B