Artificial Intelligence MCQs with Answers
Practice important Artificial Intelligence MCQs with answers and explanations.
Multiple Choice Questions
Q821: If the starter override "doesn't operate", what task is asserted next?
- A: Test ignition_switch
- B: Test engine_movement
- C: Test_starting_system
- D: Test test_battery_connection
View Answer
A
Q822: If the override switch "operates", what problem is asserted?
- A: Bad override switch
- B: Bad ignition switch
- C: Bad solenoid
- D: Bad starter
View Answer
A
Q823: What does the command (assert (task done)) signify in the diagnostic system?
- A: End of diagnosis
- B: Process continues
- C: Retesting system
- D: Restart system
View Answer
A
Q824: If the ignition switch voltmeter "moves", what problem is asserted?
- A: Bad ignition switch
- B: Bad battery
- C: Bad starter
- D: Bad override switch
View Answer
A
Q825: Which rule handles the case when the engine turns normally during cranking system test?
- A: crankingSystemIsGood
- B: crankingSystemIsDefective
- C: batteryChargeIsGood
- D: batteryChargeIsBad
View Answer
A
Q826: What is the role of the (printout t ...) command in the rules?
- A: Display messages to user
- B: Assign values to variables
- C: Read user input
- D: Stop the program
View Answer
A
Q827: What is the first stage in the design of an expert system?
- A: Alpha system
- B: Beta system
- C: Feasibility study
- D: Rapid prototyping
View Answer
C
Q828: Which phase of expert system development involves creating a working model quickly?
- A: Feasibility study
- B: Rapid prototyping
- C: Alpha system
- D: Beta system
View Answer
B
Q829: Which stage involves testing the expert system within the organization?
- A: Beta system
- B: Rapid prototyping
- C: Alpha system
- D: Feasibility study
View Answer
C
Q830: The beta version of an expert system is usually tested by _______.
- A: only developers
- B: internal stakeholders
- C: end-users
- D: system architects
View Answer
C